Questions & Answers
What is a Mezzanine floor ?
A mezzanine floor is steel structure level for extra storage, offices, production area and much more. Can be installed over freezers, existing offices, existing production areas. It is a semi-permanent floor system. It can be moved from one location to another location.
Are There any size restrictions with Mezzanine Floor ?
There are no size restrictions when it comes to designing a steel structure mezzanine floor, it can be as small or large as you'd like it.
Can I install more than one tier of Mezzanine Floor ?
It's possible to have more than one level of a steel structure mezzanine floor, given that your building has the height required available, and the base concrete is strong enough.
Can we place machinery and employers on the mezzanine floor ?
Of course. Many businesses use a steel structure mezzanine floor as a structure for additional working space. Industrial Storage Solutions will ensure that your mezzanine structure meets building regulations and can perform the loading calculations.
Do I need the landlord's permission to install a Mezzanine Floor ?
Depending on your lease agreement, you may need permission to install a steel structure mezzanine floor. You should speak with your landlord as soon as possible if you're thinking of installing a steel structure mezzanine floor.
How long does it take to install a Mezzanine Floor ?
It depends on the size of the size of the mezzanine floor, it can take 2 days for a size of 40-80sqm, and bigger than that it can take longer.
How much information do we need to provide ?
As much information as possible, the more information you can give us, the more accurate our quotation will be.
Is a site visit required ?
A site survey is recommended yes, one of our engineering team can discuss in more details things like staircases and positioning.
From placement of order, what is the time process until installation ?
Our current delivery schedule is 3 to 5 weeks, it all depends on the size and is made up on the following:
- Sent out the quote.
- Detailed site survey where the Mezzanine Floor must be installed.
- Detailed drawing submitted to client for his/her approval
- Manufacture of the steelwork
- Installation of the Mezzanine Floor.